TY - JOUR AU - Asst. Prof.Dr. Soroor k. Hussain AU - Rabab khayon shibram PY - 2017/12/21 Y2 - 2024/03/28 TI - Material Requirements Planning System (MRP) for Assembly Line of the Ground Phone (CID-103) in the Electronic Industries Company (EIC). JF - Association of Arab Universities Journal of Engineering Sciences JA - ASSOC ARA UNIV J ENG SCI VL - 24 IS - 3 SE - Articles DO - UR - https://jaaru.org/index.php/auisseng/article/view/54 AB - This paper aims to define the possibilities and methods of the practical application for one of the modern industrial systems in the control and production planning which is called Material Requirements Planning (MRP) system, in an attempt to introduce a system that help to overcome what weakness suffered by the Iraqi industry or to mitigate the impact of these weak points at least, basing on the big advantages achieved by the MRP system when applied in many industrial companies all over the world.     So it has been performed a case study in order to apply the above system in the electronic industries company (EIC) / The factory of telephones and PBX production / the assembly line of ground Phone (Model CID-103).     The most significant conclusion of this paper is that the MRP system can be applied and adopted in Iraqi industry environment to achieve various advantages associated with the use of this system, if its requirements are well and accurately prepared. ER -